AI Glossary AI strategy and buying

AI proof of concept

POCnoun · pronounced "P-O-C"

  • Tidio Agents team
  • Updated November 19, 2026
  • 6 min read
  • 7 sources
Definition

An AI proof of concept (POC) is a short, bounded test that shows whether an AI system can perform one specific task well enough, on a company's real data, to justify building it for production. It answers a feasibility question with evidence: does it work, how often, at what cost, and where does it fail?

A POC is not a demo. A demo shows that something can work on chosen examples. A POC measures how well it works on the cases a business actually sees, against success criteria agreed before the test starts. The difference decides whether the result can support an investment decision.

Many AI projects stop right after this stage. Gartner predicted that at least 30% of generative AI projects would be abandoned after proof of concept by the end of 2025, citing poor data quality, inadequate risk controls, escalating costs, or unclear business value.1 Most of those causes can be designed out at the scoping stage.

Compared

POC, pilot, and MVP

The three terms are often used interchangeably, which is one reason projects stall: the team thinks it ran a POC, and the board thinks it saw a pilot. They answer different questions.

StageQuestion it answersWho uses itDataExit decision
Proof of conceptCan it do this task well enough?The project team and reviewersReal historical data, offline or in shadow modeBuild it, change the scope, or stop
PilotDoes it work in live operations?A limited group of real customers or staffLive traffic, with fallback to peopleRoll out, fix, or roll back
MVPWill people use and value this product?Early customersLive, in productionIterate on the product
ProductionDoes it deliver the business case at scale?All intended usersLive, monitoredExpand to the next use case

The MVP comes from product development: the smallest version of a product that lets a team learn from real customers with the least effort.7 An internal AI agent may never need one. A POC and a pilot are almost always needed.

How to scope

How to scope an AI POC that leads somewhere

Good POCs share three choices: one use case, real data, and success metrics agreed upfront. Anthropic's guidance on evaluating language model applications makes the same point: success criteria should be specific and measurable before testing starts.3

One use case

Pick one high-volume request type with a clear policy, such as order status, delivery problems, or instalment questions. A POC that covers "customer service" in general proves nothing in particular.

Real data

Test on real transcripts, tickets, and documents, including the messy ones. Use only the personal data the test needs, as GDPR's data minimization principle requires.5

Metrics agreed upfront

Write down the thresholds that mean "go": resolution rate, accuracy on a labeled test set, escalation quality, cost per conversation, and latency. Agree them with the budget owner, not only the project team.

A production path

Run the POC on the architecture you would use in production: the same integrations, hosting, and security model. A POC on a laptop has to be rebuilt later, and the rebuild is where many projects stop.

yaml
use_case: delivery problems (where is my order, lost parcel)
data:
  test_set: 600 real conversations from the last 90 days
  labels: correct outcome per conversation, set by senior agents
  access: read-only, order and carrier APIs
success_criteria:
  resolved_without_human: ">= 60% of test set"
  wrong_action_rate: "< 1%"
  handover_has_full_context: "100% of escalations"
  cost_per_conversation: "below current human cost"
  p95_response_time: "< 8 seconds"
time_box: 6 weeks
decision_owner: head of customer service

Illustrative POC scope. The thresholds are examples a company would set for itself, not benchmarks.

Path

From audit to production

A POC works best as one stage in a sequence where each stage has an entry condition and an exit decision.

AuditPOCPilotProductioncriteria missed: rescopesame data access, same architecture, same metrics
Each stage reuses the previous stage's data access and metrics, so nothing is rebuilt between stages.

Tidio Agents runs projects this way: a 21-day audit with read-only access to the company's tools, which identifies the use cases and estimates their value; then a proof of concept on real data; then production on the client's own infrastructure with the code handed over. The audit stage exists so that the POC starts with a chosen use case, available data, and a number to beat.

Risks

Why AI pilots stall, and how to prevent it

Stalling has become common enough to have a name: pilot purgatory. Gartner also predicted that over 40% of agentic AI projects would be canceled by the end of 2027, due to escalating costs, unclear business value, or inadequate risk controls.2

No agreed definition of success

ControlIf nobody wrote down what "good enough" means, any result can be argued either way. Agree metrics and the decision owner before the first test.

Demo data instead of real data

ControlHand-picked examples overstate accuracy. Sample the test set from real traffic, including complaints, typos, and mixed languages.

No path to production

ControlSecurity review, integrations, and hosting are left for later and turn out to be most of the work. Clear them during the POC, or at least price them.

Hidden running costs

ControlMachine learning systems carry ongoing maintenance costs that early wins hide.6 Estimate model, monitoring, and evaluation costs per month before the go decision. See AI ROI.

No owner after the POC

ControlThe project team moves on and the operations team never asked for the system. Name the business owner who will run it before the POC starts.

In practice

What a POC tests for each agent type

The question changes with the agent. These are typical first POCs in the industries that contact customers most often.

Customer support

Retail: delivery and returns

Can the agent resolve where-is-my-order and return requests from real conversations, using the order and carrier APIs?

real tickets → resolution rate → cost per contact
Shopping

E-commerce: product advice

Does the agent recommend products that are in stock and fit the request better than site search does?

real queries → relevance → add-to-cart rate
Voice

Telecoms: billing calls

Can a voice agent understand billing questions in the local language and resolve them within policy?

recorded calls → understanding → resolution
Back office

Insurance: claims intake

Can the agent classify claim documents and extract the right fields, with uncertain cases routed to handlers?

real claims → field accuracy → review share
Fintech

Instalment questions

Can the agent answer schedule and payment questions correctly while never exposing data before identity checks?

real chats → accuracy → zero leaks
Travel

Booking changes

Can the agent apply fare rules to change requests and hand over the exceptions with full context?

real requests → correct actions → handover quality
FAQ

Common questions

How long should an AI proof of concept take?

Long enough to test on a representative sample of real data, and short enough that the decision is still relevant. Many teams time-box a POC to a few weeks. What matters more is that the time box and the success criteria are fixed in advance.

What is the difference between a POC and a pilot?

A POC tests whether the system can do the task, usually on historical data or in shadow mode. A pilot puts it in front of real customers or staff in live operations, with fallback to people.

What makes an AI POC successful?

One use case, real data, success metrics agreed before the test, an architecture that can go to production, and a business owner ready to run the system afterwards.

Why do so many AI pilots fail to reach production?

The common causes are poor data, unclear business value, rising costs, and missing risk controls. Most can be addressed at the scoping stage by choosing the use case and the metrics before building.

Sources

References

  1. Gartner. Gartner Predicts 30% of Generative AI Projects Will Be Abandoned After Proof of Concept By End of 2025. Press release, 29 July 2024.
  2. Gartner. Gartner Predicts Over 40% of Agentic AI Projects Will Be Canceled by End of 2027. Press release, 25 June 2025.
  3. Anthropic. Define success criteria and build evaluations. Claude documentation.
  4. National Institute of Standards and Technology. AI Risk Management Framework. AI RMF 1.0, January 2023.
  5. European Union. Regulation (EU) 2016/679 (General Data Protection Regulation), Article 5(1)(c).
  6. Sculley, D. et al. Hidden Technical Debt in Machine Learning Systems. NeurIPS 2015.
  7. Ries, E. The Lean Startup. Crown Business, 2011.

Tidio Agents

Build an agent that resolves, not only answers

We design and build custom AI agents for customer service, shopping and back-office work, on your infrastructure, with the code handed over to you. Projects start with a 21-day private AI audit.

Request a call